How To Instantly Apply For Electricity Supply/Power Connection (Stima) In Kenya Online – New Supply, Additional Supply, Meter Separation, Re-Routing & Temporary Supply Requirements

By KWS Adams Sep 24, 2015

This tutorial is on how to instantly apply for electricity supply/power connection in Kenya online – This entails the new supply, additional supply, meter separation, re-routing & temporary supply. The article takes you through understand the different requirements of the different electricity applications processes.

In Kenya unlike in Uganda where things are done manually and offline, there is an online application process and which is known to be almost instant. All one is required to do is having all of the requirements as you see below, an internet connection which can be gotten from the paid internet cafe and getting started.

Supply Application for New Supply of Electricity requirements

Please note that each of the below applications requires different requirements since everything differs like you can see. You will need to have all of the said requirements so as to be guaranteed of your applications being successful.

[dropshadowbox align=”none” effect=”lifted-both” width=”640px” height=”” background_color=”#ffffff” border_width=”1″ border_color=”#dddddd” ]Application for New Supply of Electricity Kenya Stima Online[/dropshadowbox]

Application for Additional Supply of Electricity requirements

[dropshadowbox align=”none” effect=”lifted-both” width=”640px” height=”” background_color=”#ffffff” border_width=”1″ border_color=”#dddddd” ]Application for Additional Supply of Electricity Kenya Stima Online[/dropshadowbox]

Application for Meter Separation requirements

[dropshadowbox align=”none” effect=”lifted-both” width=”640px” height=”” background_color=”#ffffff” border_width=”1″ border_color=”#dddddd” ]Application for Meter Separation of Electricity Kenya Stima Online[/dropshadowbox]

Application for Re-Routing requirements

[dropshadowbox align=”none” effect=”lifted-both” width=”640px” height=”” background_color=”#ffffff” border_width=”1″ border_color=”#dddddd” ]Application for Re-Routing of Electricity Kenya Stima Online[/dropshadowbox]

Application for Temporary Supply of Electricity requirements

[dropshadowbox align=”none” effect=”lifted-both” width=”640px” height=”” background_color=”#ffffff” border_width=”1″ border_color=”#dddddd” ]Application for Temporary Supply of Electricity Kenya Stima Online[/dropshadowbox]

Now that you have seen the different requirements you need on each of the application type, its time to read the entire process and what to do in addition to how to do it. It is all easy for as long as you are in need.

Liked this article or found it helpful? Share it with your friends using the social share buttons below and or post a comment to let us know your feedback or any addition using the comment form below…

By KWS Adams

My name is KWS Adams . (Call me Kateregga). I am an IT addict who loves playing around with computers and internet. Computers help me try out different things while turning them into reality, while the internet powers me stay live online. Besides computers, I am a project planning and management professional with an Award obtained from MUK, one of the oldest and best Universities in Africa. Find me on Twitter, Facebook and Whatsapp. Find more on how to contact me using the contact me page.

Related Post

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.